ControlCore
Modular Control Rooms
Managing large-scale industrial projects requires managing the risks that can throw the project off-track. None is more critical than the installation and start-up phase of the project, when there is little time to recover from errors that can lead to large budget and schedule impacts. This is also the most time-sensitive phase of the project, resulting in high-pressure situations that often result in an increased likelihood of errors. ControlCore Modular Control Rooms are being offered as a way to mitigate the risks inherent during this critical phase of the project. With ControlCore, you are assured of receiving modular control rooms that are:
- Completely designed and fabricated in-house and subjected to our thorough QA/QC process, assuring accurate wiring from the power feed through the enclosures, reducing troubleshooting time required during installation/start-up.
- Prefabricated, complete with pre-manufactured electrical enclosures, operator consoles, MCCs, and/or power distribution hardware, meaning there are fewer field connections required and therefore fewer field wiring errors during installation/start-up.
- Typically wired to accept a single incoming power source and to be “network ready” with the customers network of choice, reducing the amount of equipment mounting, field wire routing, and field wiring required during installation/start-up.
In addition to the benefits recognized during the installation and start-up phase of the project, ControlCore offers the following features:
- Built to UL-508A standards, assuring proper system design and reliable operation of the system, maximizing the life of your electrical components.
- Designed to protect the electrical components within from the environment outside. By including proper HVAC, vibration, and filtration systems, you are assured the maximum life of your hardware components.
- Built with maintenance and troubleshooting in mind, all wire routing is easily accessible and well protected in wire gutters, meaning your personnel can get to the wires when they need to, helping reduce downtime.
- Offered with optional security features limiting access to the room and protecting the electrical components within.
- Suitable for operation inside or outdoors so you have maximum flexibility in the location of your control room.
- Offered with optional trailer mounts, so they are ideal for mobile applications and/or operation in remote areas.
There are a lot of risks and potential budget and schedule impacts on large-scale industrial projects. The biggest culprit of project overruns is during the installation and start-up phase of the project, when the schedule and budget are tight and even little errors can result in big impacts. By employing a pre-designed and pre-manufactured modular control room many of those risks are mitigated, helping ensure that your installation and start-up go smoothly. Contact a Concept Systems representative today to learn more about ControlCore and how it can help keep your project on track.

